[{"data":1,"prerenderedAt":97},["Reactive",2],{"blog-inspiration-planning-outstanding-work-how-to-stay-in-control-of-workload-and-capacity":3},{"id":4,"status":5,"approved":6,"type":7,"publication_date":8,"feature_image":9,"show_circle_in_top_image":6,"tags":10,"top_background_color":11,"top_text_color":12,"logo":10,"use_case_categories":10,"translations":13,"author":83,"blog_id":16,"language_code":51,"title":52,"slug":53,"summary":20,"excerpt":54,"content":55,"extra_info":96,"result_highlights":10,"region":10,"industry":10,"company_type":10,"integrations":10,"key_features":10,"meta_title":56,"meta_description":57,"faqs":58,"partner_image":10,"partner_biography":10,"partner_author":10},839,"published",true,"inspiration","2026-10-20T12:00:00","/images/cms/814e51b0-beb2-400b-a500-8a0499578613.jpg",null,"#090049","#FFFFFF",[14,50],{"id":15,"blog_id":16,"language_code":17,"title":18,"slug":19,"summary":20,"excerpt":21,"content":22,"extra_info":10,"result_highlights":10,"region":10,"industry":10,"company_type":10,"integrations":10,"key_features":10,"meta_title":23,"meta_description":24,"faqs":25,"partner_image":10,"partner_biography":10,"partner_author":10},838,544,"nl","Werkvoorraad plannen: zo krijg je grip op openstaand werk en capaciteit","werkvoorraad-plannen-zo-krijg-je-grip-op-openstaand-werk-en-capaciteit","\u003Cp>-\u003C/p>","\u003Cp>Nieuwe opdrachten komen binnen terwijl je team druk bezig is met het afronden van lopende werkzaamheden. Ondertussen groeit de lijst met openstaande taken en wordt het steeds lastiger om te bepalen wanneer je welk werk kunt uitvoeren.&nbsp;\u003C/p>\n\u003Cp>Die lijst met openstaande werkzaamheden wordt de&nbsp;\u003Cstrong>werkvoorraad&nbsp;\u003C/strong>genoemd. Hieronder vallen alle taken, orders, werkbonnen en dossiers die nog ingepland of uitgevoerd moeten worden. Het gaat hierbij dus om werk dat nog gedaan moet worden, niet om de fysieke voorraad in een magazijn.&nbsp;\u003C/p>\n\u003Cp>Door je werkvoorraad goed te plannen, weet je precies wat er nog moet gebeuren, welke opdrachten prioriteit hebben en hoeveel tijd daarvoor beschikbaar is. Zo houd je overzicht, voorkom je onnodige vertragingen en zorg je voor een realistische planning.&nbsp;\u003C/p>\n\u003Cp>In deze blog laten we zien hoe je jouw werkvoorraad inzichtelijk maakt, prioriteiten bepaalt en openstaand werk effici&euml;nt inplant.\u003C/p>\n\u003Cp>&nbsp;\u003C/p>","\u003Ch2>Wat is werkvoorraad plannen?&nbsp;\u003C/h2>\n\u003Cp>Werkvoorraad plannen betekent dat je alle openstaande werkzaamheden overzichtelijk bijhoudt en bepaalt wanneer deze uitgevoerd kunnen worden. Daarbij kijk je naar de prioriteit van opdrachten, de benodigde tijd en de beschikbare capaciteit van je medewerkers en machines.&nbsp;\u003C/p>\n\u003Cp>Hoe die werkvoorraad eruitziet, verschilt per organisatie. Een productiebedrijf heeft bijvoorbeeld te maken met openstaande productieorders, terwijl een installatiebedrijf werkbonnen voor onderhoud en reparaties moet inplannen. Bij een accountantskantoor kan het juist gaan om dossiers die nog behandeld moeten worden.&nbsp;\u003C/p>\n\u003Cp>In al deze situaties draait het om dezelfde uitdaging: zorgen dat het werk op het juiste moment door de juiste mensen wordt uitgevoerd. Door je werkvoorraad goed te beheren, zie je welke opdrachten nog wachten, wat er al gepland staat en hoeveel ruimte er is voor nieuwe werkzaamheden.&nbsp;\u003C/p>\n\u003Cp>Een volle werkvoorraad hoeft daarbij geen probleem te zijn. Het wordt pas lastig wanneer je het overzicht verliest en niet meer goed kunt inschatten wanneer opdrachten afgerond kunnen worden.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Waarom ontstaat er te veel werkvoorraad?\u003C/h2>\n\u003Cp>Een groeiende werkvoorraad hoeft niet direct een probleem te zijn. Het kan juist betekenen dat je bedrijf veel nieuwe opdrachten ontvangt. Lastiger wordt het wanneer er structureel meer werk binnenkomt dan je team kan afronden. Opdrachten blijven langer liggen, deadlines komen onder druk te staan en het wordt steeds moeilijker om nieuwe werkzaamheden in te plannen. Dat kan verschillende oorzaken hebben.&nbsp;\u003C/p>\n\u003Ch3>Onvoldoende inzicht in beschikbare capaciteit\u003C/h3>\n\u003Cp>Wanneer je niet precies weet hoeveel tijd medewerkers of machines beschikbaar hebben, is het lastig om te bepalen hoeveel werk je kunt inplannen. Nieuwe opdrachten worden aangenomen, terwijl de planning eigenlijk al vol zit. Hierdoor stapelt het openstaande werk zich steeds verder op.\u003C/p>\n\u003Ch3>Onduidelijke prioriteiten\u003C/h3>\n\u003Cp>Niet iedere opdracht is even dringend. Toch gebeurt het regelmatig dat medewerkers beginnen aan werkzaamheden die het meest voor de hand liggen, terwijl belangrijkere opdrachten blijven liggen. Zonder duidelijke prioriteiten wordt het moeilijk om werk in de juiste volgorde uit te voeren.&nbsp;\u003C/p>\n\u003Ch3>Te veel werkzaamheden tegelijk starten\u003C/h3>\n\u003Cp>Wanneer medewerkers aan veel verschillende opdrachten tegelijk werken, moeten ze voortdurend schakelen tussen taken. Dat kost tijd en zorgt ervoor dat werkzaamheden langer open blijven staan. Door eerst lopende opdrachten af te ronden voordat je nieuwe werkzaamheden start, kun je de hoeveelheid onderhanden werk beperken.&nbsp;\u003C/p>\n\u003Ch3>Vertragingen en afhankelijkheden\u003C/h3>\n\u003Cp>Sommige werkzaamheden kunnen pas beginnen wanneer andere taken zijn afgerond. Denk aan een productieorder waarvoor nog materialen ontbreken of een servicemonteur die wacht op een onderdeel. Als deze afhankelijkheden niet duidelijk zijn, worden opdrachten soms te vroeg ingepland en ontstaan er onnodige vertragingen.&nbsp;\u003C/p>\n\u003Cp>Een grote werkvoorraad ontstaat dus niet altijd door een tekort aan medewerkers of tijd. Ook de manier waarop werkzaamheden worden verdeeld, ingepland en uitgevoerd speelt een belangrijke rol.\u003C/p>\n\u003Chr>\n\u003Ch2>Werkvoorraad, backlog en onderhanden werk: wat is het verschil?&nbsp;\u003C/h2>\n\u003Cp>Bij het plannen van werkzaamheden kom je regelmatig begrippen tegen zoals werkvoorraad, backlog en onderhanden werk. Deze termen worden soms door elkaar gebruikt, maar hebben ieder een andere betekenis.&nbsp;\u003C/p>\n\u003Cp>Het belangrijkste verschil zit in de fase waarin een opdracht zich bevindt. Sommige werkzaamheden moeten nog worden ingepland, andere staan al op de planning of zijn inmiddels in uitvoering.&nbsp;\u003C/p>\n\u003Cdiv style=\"width: 100%; overflow-x: auto; margin: 24px 0;\">\n\u003Ctable style=\"width: 100%; border-collapse: collapse; font-family: inherit; font-size: 15px; line-height: 1.6; text-align: left;\">\n\u003Cthead>\n\u003Ctr style=\"background-color: #f3f4f6;\">\n\u003Cth style=\"border: 1px solid #d1d5db; padding: 14px;\">Begrip\u003C/th>\n\u003Cth style=\"border: 1px solid #d1d5db; padding: 14px;\">Betekenis\u003C/th>\n\u003Cth style=\"border: 1px solid #d1d5db; padding: 14px;\">Voorbeeld\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">\u003Cstrong>Werkvoorraad\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Al het openstaande werk dat nog uitgevoerd of afgerond moet worden.\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">80 openstaande serviceopdrachten.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">\u003Cstrong>Backlog\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Werk dat nog niet concreet is ingepland.\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">25 opdrachten die wachten op een geschikt uitvoeringsmoment.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">\u003Cstrong>Gepland werk\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Werk waarvoor een uitvoeringsmoment of medewerker is toegewezen.\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Een onderhoudsbeurt die voor donderdag is ingepland.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">\u003Cstrong>Onderhanden werk (WIP)\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Werkzaamheden die al gestart zijn, maar nog niet zijn afgerond.\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Een installatieproject waaraan monteurs momenteel werken.\u003C/td>\n\u003C/tr>\n\u003C/tbody>\n\u003C/table>\n\u003Cp>De backlog is een onderdeel van je totale werkvoorraad. Zodra je een opdracht vanuit de backlog inplant, krijgt deze een plek in de planning. Wanneer medewerkers ermee aan de slag gaan, spreken we van onderhanden werk, ook wel Work in Progress (WIP) genoemd. Pas wanneer de opdracht is afgerond, verdwijnt deze uit de openstaande werkvoorraad.&nbsp;\u003C/p>\n\u003Cp>Door dit onderscheid te maken, zie je beter waar werkzaamheden blijven liggen. Staan er bijvoorbeeld veel opdrachten te wachten om ingepland te worden, of zijn er juist veel werkzaamheden gestart die nog niet zijn afgerond? Met dat inzicht kun je gerichten bepalen waar je planning aandacht nodig heeft.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Hoe maak je jouw werkvoorraad inzichtelijk?&nbsp;\u003C/h2>\n\u003Cp>Een goede werkvoorraadplanning begint met overzicht. Je moet weten welke opdrachten er nog openstaan voordat je kunt bepalen wanneer je ze gaat uitvoeren. Toch is dat in de praktijk niet altijd even eenvoudig.&nbsp;\u003C/p>\n\u003Cp>Nieuwe opdrachten komen bijvoorbeeld binnen via e-mail, lopende werkzaamheden staan in Excel en medewerkers houden hun eigen takenlijsten bij. Hierdoor raakt informatie verspreid en wordt het lastig om een volledig beeld te krijgen van al het werk dat nog gedaan moet worden.&nbsp;\u003C/p>\n\u003Cp>Door alle openstaande werkzaamheden op &eacute;&eacute;n centrale plek te verzamelen, ontstaat er meer overzicht. Je ziet welke opdrachten nog ingepland moeten worden, wat er al op de planning staat en welke werkzaamheden inmiddels zijn gestart.&nbsp;\u003C/p>\n\u003Ch3>Welke informatie heb je nodig?&nbsp;\u003C/h3>\n\u003Cp>Alleen een lijst met openstaande opdrachten is niet voldoende. Om je werkvoorraad goed te kunnen beheren, heb je ook informatie nodig over de inhoud, voortgang en benodigde tijd van iedere opdracht. De onderstaande gegevens helpen je daarbij:&nbsp;\u003C/p>\n\u003C/div>\n\u003Cdiv style=\"width: 100%; overflow-x: auto; margin: 24px 0;\">\n\u003Ctable style=\"width: 100%; border-collapse: collapse; font-family: inherit; font-size: 15px; line-height: 1.6; text-align: left;\">\n\u003Cthead>\n\u003Ctr style=\"background-color: #f3f4f6;\">\n\u003Cth style=\"border: 1px solid #d1d5db; padding: 14px; text-align: left; width: 30%;\" scope=\"col\">Gegeven\u003C/th>\n\u003Cth style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; text-align: left; width: 70%;\" scope=\"col\">Waarom is het belangrijk?\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 30%;\">\u003Cstrong>Opdracht of taak\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 70%;\">Maakt duidelijk welke werkzaamheden uitgevoerd moeten worden.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 30%;\">\u003Cstrong>Status\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 70%;\">Laat zien of werk nog ingepland moet worden, al gepland is of in uitvoering is.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 30%;\">\u003Cstrong>Prioriteit\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 70%;\">Geeft aan welke opdrachten als eerste aandacht nodig hebben.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 30%;\">\u003Cstrong>Deadline\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 70%;\">Laat zien wanneer werkzaamheden uiterlijk afgerond moeten zijn.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 30%;\">\u003Cstrong>Geschatte tijd\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 70%;\">Maakt duidelijk hoeveel capaciteit een opdracht vraagt.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 30%;\">\u003Cstrong>Verantwoordelijke\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 70%;\">Laat zien wie de opdracht uitvoert of beheert.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 30%;\">\u003Cstrong>Type werk\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 70%;\">Helpt bij het verdelen van werkzaamheden over de juiste medewerkers of teams.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 30%;\">\u003Cstrong>Afhankelijkheden\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(209, 213, 219); padding: 14px; width: 70%;\">Maakt zichtbaar welke voorwaarden eerst vervuld moeten worden.\u003C/td>\n\u003C/tr>\n\u003C/tbody>\n\u003C/table>\n\u003Cp>Met deze informatie kun je jouw werkvoorraad veel gerichter bekijken. Je ziet bijvoorbeeld welke opdrachten binnenkort afgerond moeten zijn, hoeveel uren er nog openstaan en welke werkzaamheden wachten op een specifieke medewerker of machine.&nbsp;\u003C/p>\n\u003Cp>Zo ontstaat er een actueel overzicht waarmee je verder kunt plannen. De volgende stap is bepalen welke opdrachten voorrang krijgen.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Hoe prioriteer je jouw werkvoorraad?&nbsp;\u003C/h2>\n\u003Cp>Wanneer je alle openstaande werkzaamheden in beeld hebt, is het tijd om te bepalen welke opdrachten als eerste uitgevoerd moeten worden. Niet iedere opdracht is even dringend en sommige werkzaamheden kunnen prima nog even wachten.&nbsp;\u003C/p>\n\u003Cp>Bij het prioriteren van je werkvoorraad kijk je onder andere naar deadlines, urgentie, klantafspraken en de benodigde capaciteit. Zo voorkom je dat medewerkers vooral bezig zijn met de opdrachten die toevallig als eerste binnenkwamen, terwijl belangrijker werk blijft liggen.&nbsp;\u003C/p>\n\u003Ch3>Bepaal welke opdrachten voorrang krijgen\u003C/h3>\n\u003Cp>Een eenvoudige manier om prioriteiten aan te brengen, is door je werkvoorraad in drie categorie&euml;n te verdelen:&nbsp;\u003C/p>\n\u003Cul>\n\u003Cli>\u003Cstrong>Hoge prioriteit:&nbsp;\u003C/strong>spoedopdrachten, werkzaamheden met een naderende deadline of taken die andere processen ophouden.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Normale prioriteit:&nbsp;\u003C/strong>reguliere opdrachten die volgens de gemaakte afspraken uitgevoerd moeten worden.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Lage prioriteit:&nbsp;\u003C/strong>werkzaamheden die minder dringend zijn en waarvan de uitvoering eventueel kan worden uitgesteld.&nbsp;\u003C/li>\n\u003C/ul>\n\u003Cp>Je kunt hiervoor ook een \u003Ca href=\"https://vplan.com/nl/blog/inspiratie/moscow-methode\" target=\"_blank\" rel=\"noopener\">methode zoals MoSCoW\u003C/a> gebruiken. Hierbij verdeel je werkzaamheden in vier categorie&euml;n: Must have, Should have, Could have en Won't have. Dit helpt vooral wanneer je met meerdere betrokkenen moet bepalen welke werkzaamheden het belangrijkst zijn.\u003C/p>\n\u003Cp>Welke methode je ook gebruikt, zorg dat de prioriteiten voor iedereen duidelijk zijn. Zo weten medewerkers welke opdrachten als eerste aandacht verdienen en kan de planner hier rekening mee houden.&nbsp;\u003C/p>\n\u003Ch3>Houd rekening met afhankelijkheden\u003C/h3>\n\u003Cp>Een opdracht met een hoge prioriteit kan niet altijd direct worden uitgevoerd. Soms ontbreken er materialen, moet een andere taak eerst worden afgerond of is een specifieke medewerker nog niet beschikbaar.&nbsp;\u003C/p>\n\u003Cp>Stel dat een productiebedrijf een belangrijke order moet afronden, maar de benodigde grondstoffen pas over drie dagen worden geleverd. Dan heeft het weinig zin om deze order vandaag al in te plannen. De beschikbare tijd kan beter worden besteed aan werkzaamheden die wel direct uitgevoerd kunnen worden.&nbsp;\u003C/p>\n\u003Cp>Houd daarom bij het prioriteren ook rekening met de uitvoerbaarheid van opdrachten. Zo zorg je ervoor dat belangrijke werkzaamheden op tijd worden opgepakt, zonder dat andere opdrachten onnodig vertraging oplopen.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Hoe koppel je werkvoorraad aan beschikbare capaciteit?&nbsp;\u003C/h2>\n\u003Cp>Je hebt inmiddels inzicht in je openstaande opdrachten en weet welke werkzaamheden prioriteit hebben. Maar passen al die opdrachten ook daadwerkelijk in de planning? Om dat te bepalen, moet je weten hoeveel tijd het werk kost en hoeveel capaciteit je team beschikbaar heeft.&nbsp;\u003C/p>\n\u003Cp>Begin met het inschatten van de benodigde uren per opdracht. Vergelijk deze volgens met de beschikbare uren van je medewerkers, teams of machines. Houd daarbij ook rekening met vakanties, verlof, onderhoud en andere werkzaamheden die tijd in beslag nemen.&nbsp;\u003C/p>\n\u003Cp>Met vPlan maak je deze capaciteit eenvoudig inzichtelijk. Je ziet hoeveel werk er al gepland staat en waar medewerkers of teams nog ruimte hebben. Zo kun je nieuwe opdrachten beter verdelen en voorkom je dat je de ene medewerker overbelast, terwijl een ander nog tijd beschikbaar heeft.&nbsp;\u003C/p>\n\u003Ch3>Een praktisch voorbeeld\u003C/h3>\n\u003Cp>Stel dat een serviceteam 120 openstaande werkbonnen heeft, samen goed voor 420 uur werk. Voor de komende twee weken heeft het team 300 uur aan beschikbare capaciteit.&nbsp;\u003C/p>\n\u003Cp>Dat betekent dat je niet alle opdrachten binnen die twee weken kunt uitvoeren. Er blijft namelijk 120 uur aan werk over dat je op een later moment moet inplannen.&nbsp;\u003C/p>\n\u003Cp>Om een beter beeld te krijgen van de omvang van je werkvoorraad, kun je de volgende berekening gebruiken:&nbsp;\u003C/p>\n\u003Cblockquote>\n\u003Cp>\u003Cstrong>Openstaande werkuren / beschikbare uren per planperiode = aantal planperioden aan werkvoorraad\u003C/strong>\u003C/p>\n\u003C/blockquote>\n\u003Cp>In dit voorbeeld is dat 420 / 300 = 1,4 planperioden. Er staat dus voor ongeveer 2,8 weken aan werk open, uitgaande van een gelijkblijvende capaciteit en zonder nieuwe opdrachten. De planner kan nu bepalen welke werkbonnen voorrang krijgen en welke voorlopig in de werkvoorraad blijven staan.\u003C/p>\n\u003Ch3>Kijk verder dan alleen het aantal beschikbare uren\u003C/h3>\n\u003Cp>Een overzicht van de totale capaciteit is een goed begin, maar vertelt niet altijd het hele verhaal. Misschien heeft je team voldoende uren beschikbaar, terwijl juist de medewerkers met specifieke kennis al volledig zijn ingepland.&nbsp;\u003C/p>\n\u003Cp>Daarom is het belangrijk om ook naar de verdeling van het werk te kijken. In vPlan kun je met de werkbelasting inzicht krijgen in hoeveel werk er per medewerker of resource gepland staat. Hierdoor zie je sneller waar knelpunten ontstaan en waar nog ruimte is om opdrachten in te plannen.&nbsp;\u003C/p>\n\u003Cp>Door je werkvoorraad op deze manier aan capaciteit te koppelen, maak je beter onderbouwde keuzes. Je weet hoeveel werk je kunt uitvoeren, welke opdrachten nog moeten wachten en wanneer er weer ruimte ontstaat voor nieuwe werkzaamheden.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Hoe plan je jouw werkvoorraad? 8 praktische stappen\u003C/h2>\n\u003Cp>Inmiddels weet je welke opdrachten er openstaan, wat prioriteit heeft en hoeveel capaciteit je beschikbaar hebt. Tijd om die informatie om te zetten in een concrete planning. Met de onderstaande acht stappen zorg je ervoor dat werkzaamheden op het juiste moment worden ingepland en je het overzicht behoudt wanneer er iets verandert.&nbsp;\u003C/p>\n\u003Ch3>Stap 1. Verzamel al het openstaande werk\u003C/h3>\n\u003Cp>Begin met het verzamelen van alle opdrachten die nog uitgevoerd moeten worden. Neem hierbij ook werkzaamheden mee die eerder zijn uitgesteld of nog wachten op een geschikt moment. Door alles op &eacute;&eacute;n plek bij te houden, voorkom je dat opdrachten over het hoofd worden gezien.&nbsp;\u003C/p>\n\u003Ch3>Stap 2. Controleer en actualiseer je werkvoorraad\u003C/h3>\n\u003Cp>Niet iedere opdracht in je werkvoorraad is automatisch nog actueel. Misschien is een taak inmiddels afgerond, een deadline verschoven of staat dezelfde opdracht er dubbel in. Loop je werkvoorraad daarom regelmatig na en zorg dat de informatie klopt voordat je gaat plannen.&nbsp;\u003C/p>\n\u003Ch3>Stap 3. Bepaal welke opdrachten voorrang krijgen\u003C/h3>\n\u003Cp>Bekijk welke werkzaamheden het belangrijkst zijn en als eerste uitgevoerd moeten worden. Houd rekening met deadlines, klantafspraken en eventuele afhankelijkheden. Zo zorg je ervoor dat dringende opdrachten niet blijven liggen.&nbsp;\u003C/p>\n\u003Ch3>Stap 4. Breng de beschikbare capaciteit in kaart\u003C/h3>\n\u003Cp>Controleer hoeveel tijd je medewerkers, teams of machines beschikbaar hebben in de periode waarvoor je gaat plannen. Vergeet daarbij vakanties, verlof en andere werkzaamheden niet. Zo weet je hoeveel werk je daadwerkelijk kunt inplannen.&nbsp;\u003C/p>\n\u003Ch3>Stap 5. Kies hoe ver je vooruit wilt plannen\u003C/h3>\n\u003Cp>De juiste planperiode verschilt per organisatie. Een serviceteam dat regelmatig spoedopdrachten ontvangt, heeft bijvoorbeeld baat bij een planning die dagelijks kan worden aangepast. Een productiebedrijf met langere doorlooptijden kijkt vaak meerdere weken vooruit. Kies daarom een periode die past bij de manier waarop jouw bedrijf werkt.\u003C/p>\n\u003Ch3>Stap 6. Plan de werkzaamheden in\u003C/h3>\n\u003Cp>Nu kun je de opdrachten verdelen over de beschikbare medewerkers of machines. Begin met de belangrijkste werkzaamheden en controleer of de benodigde tijd binnen de planning past. Houd waar nodig wat ruimte vrij voor onverwachte opdrachten of vertragingen.&nbsp;\u003C/p>\n\u003Ch3>Stap 7. Houd de voortgang bij&nbsp;\u003C/h3>\n\u003Cp>Een planning maken is &eacute;&eacute;n ding, maar je wilt natuurlijk ook weten of het werk volgens planning verloopt. Controleer daarom regelmatig welke opdrachten zijn gestart, afgerond of vertraagd. Zo zie je op tijd wanneer werkzaamheden uitlopen en kun je voorkomen dat achterstanden zich verder opstapelen.&nbsp;\u003C/p>\n\u003Ch3>Stap 8. Werk je planning regelmatig bij\u003C/h3>\n\u003Cp>Nieuwe opdrachten, veranderende prioriteiten of een medewerker die onverwacht uitvalt: er kan altijd iets gebeuren waardoor je planning moet worden aangepast. Door je werkvoorraad en planning regelmatig bij te werken, blijft het overzicht actueel en weet iedereen waar hij aan toe is.&nbsp;\u003C/p>\n\u003Cp>Met deze werkwijze maak je van werkvoorraad plannen een vast onderdeel van je dagelijkse werkzaamheden. Je houdt grip op wat er nog moet gebeuren en kunt sneller inspelen op veranderingen.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Hoeveel werkvoorraad is gezond?&nbsp;\u003C/h2>\n\u003Cp>Er bestaat geen vaste hoeveelheid werkvoorraad die voor ieder bedrijf ideaal is. Hoeveel openstaand werk gezond is, hangt onder andere af van de beschikbare capaciteit, de doorlooptijd van opdrachten en de hoeveelheid nieuw werk die binnenkomt.&nbsp;\u003C/p>\n\u003Cp>Een productiebedrijf dat maanden vooruit plant, heeft bijvoorbeeld een andere werkvoorraad nodig dan een serviceteam dat dagelijks nieuwe storingen en spoedopdrachten ontvangt. Een grote werkvoorraad hoeft dus geen probleem te zijn, zolang je weet wanneer je de opdrachten kunt uitvoeren en gemaakte afspraken kunt nakomen.&nbsp;\u003C/p>\n\u003Ch3>Signalen dat je werkvoorraad te groot wordt\u003C/h3>\n\u003Cp>Toch zijn er verschillende signalen waaraan je kunt herkennen dat de werkvoorraad niet meer goed aansluit op de beschikbare capaciteit. Denk bijvoorbeeld aan:&nbsp;\u003C/p>\n\u003Cul>\n\u003Cli>\u003Cstrong>Deadlines worden regelmatig verschoven,&nbsp;\u003C/strong>omdat er onvoldoende tijd is om alle opdrachten af te ronden .\u003C/li>\n\u003Cli>\u003Cstrong>Medewerkers maken structureel overuren&nbsp;\u003C/strong>om de hoeveelheid werk bij te houden.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Opdrachten blijven steeds langer liggen,&nbsp;\u003C/strong>waardoor klanten langer moeten wachten.\u003C/li>\n\u003Cli>\u003Cstrong>De backlog blijft groeien,&nbsp;\u003C/strong>omdat er meer werk binnenkomt dan je team kan afronden.&nbsp;\u003C/li>\n\u003C/ul>\n\u003Cp>Om dit op tijd te herkennen, is het verstandig om regelmatig te kijken hoeveel nieuw werk er binnenkomt en hoeveel werk je daadwerkelijk afrondt. Wanneer de werkvoorraad week na week groeit, is dat een teken dat je de planning, prioriteiten of beschikbare capaciteit opnieuw moet bekijken.&nbsp;\u003C/p>\n\u003Cp>Een gezonde werkvoorraad is vooral een hoeveelheid werk die je goed kunt overzien, realistisch kunt inplannen en binnen de afgesproken termijnen kunt uitvoeren.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Werkvoorraad beheren in Excel of met software?&nbsp;\u003C/h2>\n\u003Cp>Veel bedrijven beginnen met het beheren van hun werkvoorraad in Excel. Dat is ook helemaal niet zo gek. Je maakt eenvoudig een overzicht van openstaande opdrachten, voegt deadlines toe en houdt bij welke werkzaamheden zijn afgerond. Voor een klein team met een overzichtelijke werkvoorraad kan dat prima werken.&nbsp;\u003C/p>\n\u003Cp>Maar naarmate je bedrijf groeit, wordt het vaak lastiger om dat overzicht bij te houden. Er komen meer opdrachten binnen, meerdere medewerkers werken aan dezelfde planning en prioriteiten veranderen regelmatig. Het handmatig bijwerken van al die informatie kost steeds meer tijd en vergroot de kans op fouten.&nbsp;\u003C/p>\n\u003Cp>Op dat moment kan gespecialiseerde werkvoorraadsoftware uitkomst bieden. Hiermee breng je openstaande opdrachten, de planning en beschikbare capaciteit samen op &eacute;&eacute;n plek. Wijzigingen zijn direct zichtbaar voor betrokken medewerkers, waardoor je minder tijd kwijt bent aan het bijwerken en afstemmen van de planning.&nbsp;\u003C/p>\n\u003Ch3>Excel versus werkvoorraadsoftware\u003C/h3>\n\u003C/div>\n\u003Cdiv style=\"width: 100%; overflow-x: auto; margin: 24px 0;\">\n\u003Ctable style=\"width: 100%; border-collapse: collapse; font-family: inherit; font-size: 15px; line-height: 1.6; text-align: left;\">\n\u003Cthead>\n\u003Ctr style=\"background-color: #f3f4f6;\">\n\u003Cth style=\"width: 50%; border: 1px solid #d1d5db; padding: 14px; text-align: left;\" scope=\"col\">Werkvoorraad beheren in Excel\u003C/th>\n\u003Cth style=\"width: 50%; border: 1px solid #d1d5db; padding: 14px; text-align: left;\" scope=\"col\">Werkvoorraad beheren met software\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Geschikt voor kleine, overzichtelijke werkvoorraden.\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Geschikt voor grotere en veranderlijke werkvoorraden.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Gegevens moeten vaak handmatig worden bijgewerkt.\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Wijzigingen en statussen kunnen centraal worden bijgehouden.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Capaciteit berekenen vraagt om eigen formules.\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Capaciteit en werkbelasting kunnen direct aan de planning worden gekoppeld.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Samenwerken vraagt om duidelijke afspraken over versies en wijzigingen.\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Meerdere medewerkers kunnen vanuit dezelfde actuele planning werken.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Automatiseringen en koppelingen vragen extra inrichting.\u003C/td>\n\u003Ctd style=\"border: 1px solid #d1d5db; padding: 14px;\">Integraties en automatiseringen zijn vaak standaard beschikbaar.\u003C/td>\n\u003C/tr>\n\u003C/tbody>\n\u003C/table>\n\u003Ch3>Wanneer is werkvoorraadsoftware interessant?&nbsp;\u003C/h3>\n\u003Cp>De overstap naar software wordt vooral interessant wanneer je merkt dat het bijhouden van de werkvoorraad steeds meer tijd kost. Misschien heb je wel een overzicht van alle openstaande opdrachten, maar weet je niet precies wanneer medewerkers beschikbaar zijn. Of je moet de planning telkens handmatig aanpassen zodra er een nieuwe spoedopdracht binnenkomt.&nbsp;\u003C/p>\n\u003Cp>Met planningssoftware zoals vPlan kun je jouw werkvoorraad direct koppelen aan de beschikbare capaciteit. Zo zie je welke werkzaamheden nog ingepland moeten worden, waar ruimte is voor nieuwe opdrachten en hoe de werkbelasting over je team is verdeeld.&nbsp;\u003C/p>\n\u003Cp>Dat maakt het gemakkelijker om vooruit te plannen en wijzigingen door te voeren, zonder steeds opnieuw allerlei losse overzichten te moeten bijwerken.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Waar moet goede werkvoorraadsoftware aan voldoen?&nbsp;\u003C/h2>\n\u003Cp>Er zijn verschillende tools waarmee je werkzaamheden kunt plannen en beheren. Toch is niet iedere planningstool even geschikt voor het beheren van een werkvoorraad. Sommige richten zich vooral op het bijhouden van taken, terwijl andere juist meer mogelijkheden bieden om werkzaamheden te plannen op basis van beschikbare capaciteit.&nbsp;\u003C/p>\n\u003Cp>Welke software het beste past bij jouw bedrijf, hangt af van de manier waarop je werkt. Een productiebedrijf heeft bijvoorbeeld behoefte aan inzicht in de beschikbare machinecapaciteit, terwijl een installatiebedrijf vooral wil weten welke monteurs beschikbaar zijn voor openstaande werkbonnen.&nbsp;\u003C/p>\n\u003Cp>Bij het vergelijken van werkvoorraadsoftware zijn er een aantal functionaliteiten waar je op kunt letten:&nbsp;\u003C/p>\n\u003Cul>\n\u003Cli>\u003Cstrong>Een overzichtelijke backlog:&nbsp;\u003C/strong>verzamel opdrachten die nog ingepland moeten worden op &eacute;&eacute;n centrale plek.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Prioriteiten en deadlines: \u003C/strong>zie welke werkzaamheden voorrang hebben en wanneer opdrachten uiterlijk afgerond moeten zijn.\u003C/li>\n\u003Cli>\u003Cstrong>Capaciteitsplanning:&nbsp;\u003C/strong>krijg inzicht in de beschikbare uren van medewerkers, teams of machines en voorkom dat je meer werk inplant dan er capaciteit beschikbaar is.\u003C/li>\n\u003Cli>\u003Cstrong>Verschillende planningsweergaven:&nbsp;\u003C/strong>bekijk werkzaamheden bijvoorbeeld in een \u003Ca href=\"https://vplan.com/nl/functionaliteiten/tijdlijn\" target=\"_blank\" rel=\"noopener\">tijdlijn\u003C/a>, \u003Ca href=\"https://vplan.com/nl/functionaliteiten/kalender\" target=\"_blank\" rel=\"noopener\">kalender\u003C/a>, \u003Ca href=\"https://vplan.com/nl/functionaliteiten/kanban\" target=\"_blank\" rel=\"noopener\">kanban-bord\u003C/a> of \u003Ca href=\"https://vplan.com/nl/functionaliteiten/lijst\" target=\"_blank\" rel=\"noopener\">lijst\u003C/a>, afhankelijk van wat voor jouw team het prettigst werkt.\u003C/li>\n\u003Cli>\u003Cstrong>Voortgang en statussen:&nbsp;\u003C/strong>houd bij welke opdrachten nog wachten, al zijn ingepland of inmiddels worden uitgevoerd.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Automatiseringen en integraties: \u003C/strong>beperk handmatig werk door terugkerende handelingen te automatiseren en gegevens uit te wisselen met andere systemen.\u003C/li>\n\u003Cli>\u003Cstrong>Samenwerking en mobiel gebruik: \u003C/strong>zorg dat medewerkers de planning kunnen bekijken en de voortgang kunnen bijwerken, ook wanneer ze onderweg of op locatie aan het werk zijn. &nbsp;\u003C/li>\n\u003C/ul>\n\u003Cp>Het is verstandig om bij het kiezen van software verder te kijken dan de hoeveelheid functionaliteiten. Uiteindelijk wil je vooral dat de software aansluit op de dagelijkse werkzaamheden van je team.&nbsp;\u003C/p>\n\u003Cp>Besteed daarbij extra aandacht aan de verbinding tussen je werkvoorraad en de beschikbare capaciteit. Wanneer je direct kunt zien hoeveel werk er nog openstaat en hoeveel ruimte er in de planning is, wordt het een stuk eenvoudiger om nieuwe opdrachten in te plannen en op tijd bij te sturen.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Werkvoorraad plannen met vPlan\u003C/h2>\n\u003Cp>Wil je meer grip krijgen op je werkvoorraad en voorkomen dat opdrachten onnodig blijven liggen? Met vPlan breng je al je openstaande werkzaamheden, de planning en beschikbare capaciteit samen in &eacute;&eacute;n overzicht. Zo weet je precies wat er nog moet gebeuren, welke opdrachten prioriteit hebben en wanneer je team tijd heeft om ze uit te voeren.&nbsp;\u003C/p>\n\u003Ch3>Van openstaande opdrachten naar een overzichtelijke planning\u003C/h3>\n\u003Cp>Met de backlog van vPlan verzamel je eenvoudig alle werkzaamheden die nog ingepland moeten worden. Geef opdrachten een prioriteit, voeg deadlines en andere belangrijke informatie toe en bepaal vervolgens wanneer je ze wilt uitvoeren.&nbsp;\u003C/p>\n\u003Cp>Zodra er ruimte ontstaat, plan je de werkzaamheden vanuit de backlog in op je planbord. Je kunt daarbij kiezen uit verschillende weergaven, zoals de tijdlijn, kalender, Kanban of lijst. Zo werk je op de manier die het beste bij jouw team past.&nbsp;\u003C/p>\n\u003Ch3>Plan op basis van beschikbare capaciteit\u003C/h3>\n\u003Cp>E&eacute;n van de grootste voordelen van vPlan is het inzicht in capaciteit en werkbelasting. Je ziet hoeveel werk er al gepland staat, welke medewerkers of machines beschikbaar zijn en waar nog ruimte is voor nieuwe opdrachten.&nbsp;\u003C/p>\n\u003Cp>Hierdoor kun je werkzaamheden beter verdelen en voorkom je dat je planning voller raakt dan je team aankan. Komt er onverwacht een spoedopdracht binnen? Dan zie je sneller waar ruimte is en kun je de planning eenvoudig aanpassen.&nbsp;\u003C/p>\n\u003Ch3>Houd je werkvoorraad en voortgang altijd actueel\u003C/h3>\n\u003Cp>Ook nadat werkzaamheden zijn ingepland, houd je met vPlan het overzicht. Medewerkers kunnen de voortgang bijwerken, terwijl jij direct ziet welke opdrachten zijn gestart, afgerond of vertraging oplopen.&nbsp;\u003C/p>\n\u003Cp>Met automatiseringen en koppelingen met andere systemen kun je bovendien veel handmatig werk besparen. Zo blijft je planning actueel en heeft iedereen toegang tot dezelfde informatie.&nbsp;\u003C/p>\n\u003Ch3>Ontdek hoe vPlan jouw werkvoorraad overzichtelijk maakt\u003C/h3>\n\u003Cp>Of je nu productieorders, serviceopdrachten of projecten plant: met vPlan krijg je meer overzicht over je werkvoorraad en de capaciteit van je team. Je ziet wat er nog moet gebeuren, plant werkzaamheden op het juiste moment en houdt grip op de uitvoering.&nbsp;\u003C/p>\n\u003Cp>\u003Cstrong>Benieuwd wat vPlan voor jouw organisatie kan betekenen?&nbsp;\u003C/strong>\u003Ca href=\"https://vplan.com/nl/demo\" target=\"_blank\" rel=\"noopener\">Vraag een persoonlijke demo aan\u003C/a> en ontdek hoe je jouw werkvoorraad slimmer kunt plannen. Of ga zelf aan de slag en \u003Ca href=\"https://vplan.com/nl/probeer-gratis\" target=\"_blank\" rel=\"noopener\">maak gratis een proefomgeving aan\u003C/a>.&nbsp;\u003C/p>\n\u003C/div>","Werkvoorraad plannen: 8 stappen voor meer grip | vPlan","Leer hoe je jouw werkvoorraad inzichtelijk maakt, prioriteiten stelt en werkzaamheden plant op basis van capaciteit. Inclusief 8 praktische stappen & tips.",[26,29,32,35,38,41,44,47],{"question":27,"answer":28},"Wat is werkvoorraad?","\u003Cp>Werkvoorraad is al het openstaande werk binnen een organisatie dat nog ingepland, uitgevoerd of afgerond moet worden. Denk bijvoorbeeld aan productieorders, serviceopdrachten, werkbonnen, projecten of administratieve dossiers.&nbsp;\u003C/p>\n\u003Cp>Door je werkvoorraad goed bij te houden, weet je welke werkzaamheden nog openstaan en hoeveel tijd nodig is om deze af te ronden. Dat helpt om prioriteiten te stellen, de beschikbare capaciteit&nbsp; beter te benutten en te voorkomen dat opdrachten onnodig blijven liggen.\u003C/p>",{"question":30,"answer":31},"Wat is het verschil tussen werkvoorraad en backlog?","\u003Cp>Werkvoorraad en backlog worden regelmatig door elkaar gebruikt, maar betekenen niet precies hetzelfde. De werkvoorraad omvat al het openstaande werk, inclusief opdrachten die al zijn ingepland of worden uitgevoerd.&nbsp;\u003C/p>\n\u003Cp>Een backlog bestaat uit werkzaamheden die nog niet in een concrete uitvoeringsplanning staan. Denk aan nieuwe opdrachten die wachten op een beschikbare medewerker of productieorders die pas volgende maand kunnen worden ingepland.&nbsp;\u003C/p>\n\u003Cp>De backlog is daarmee een onderdeel van de totale werkvoorraad. Zodra je een opdracht vanuit de backlog inplant, krijgt deze een plek in de planning. De opdracht blijft onderdeel van de werkvoorraad totdat deze volledig is afgerond.\u003C/p>",{"question":33,"answer":34},"Hoe kun je werkvoorraad het beste prioriteren?","\u003Cp>Je kunt werkvoorraad prioriteren door opdrachten te beoordelen op urgentie, deadlines, klantafspraken en afhankelijkheden. Werkzaamheden die dringend zijn of andere processen ophouden, krijgen doorgaans voorrang.&nbsp;\u003C/p>\n\u003Cp>Een praktische aanpak is om opdrachten in te delen in hoge, normale en lage prioriteit. Zo wordt voor iedereen duidelijk welke werkzaamheden als eerste uitgevoerd moeten worden.&nbsp;\u003C/p>\n\u003Cp>Houd daarnaast rekening met de uitvoerbaarheid. Een opdracht kan nog zo dringend zijn, maar wanneer materialen ontbreken of de juiste medewerker niet beschikbaar is, kun je deze mogelijk nog niet uitvoeren. Door prioriteiten regelmatig te controleren, blijft de volgorde van werkzaamheden aansluiten op de actuele situatie.&nbsp;\u003C/p>",{"question":36,"answer":37},"Hoe bereken je hoeveel werkvoorraad je hebt?","\u003Cp>Om de omvang van je werkvoorraad te berekenen, tel je de geschatte benodigde uren van alle openstaande opdrachten bij elkaar op. Vervolgens vergelijk je deze met de beschikbare capaciteit van je medewerkers of machines.&nbsp;\u003C/p>\n\u003Cp>Stel dat je 400 uur aan openstaand werk hebt en je team wekelijks 200 uur beschikbaar is. Dan heb je voor ongeveer twee weken aan werkvoorraad, uitgaande van een gelijkblijvende capaciteit en zonder nieuwe opdrachten.\u003C/p>\n\u003Cp>Houd er rekening mee dat niet iedere medewerker of machine voor iedere opdracht inzetbaar is. Kijk daarom ook naar de verdeling van werkzaamheden over je team. Met capaciteitsplanning krijg je een beter beeld van hoeveel werk je daadwerkelijk kunt uitvoeren en wanneer er ruimte ontstaat voor nieuwe opdrachten.&nbsp;\u003C/p>",{"question":39,"answer":40},"Kun je werkvoorraad beheren in Excel?","\u003Cp>Ja, je kunt werkvoorraad prima beheren in Excel. Vooral voor kleinere teams met een overzichtelijke hoeveelheid opdrachten kan een spreadsheet voldoende zijn. Je kunt hierin werkzaamheden, deadlines, prioriteiten en statussen vastleggen.&nbsp;\u003C/p>\n\u003Cp>Wanneer je bedrijf groeit, wordt het vaak lastiger om dit overzicht actueel te houden. Meerdere medewerkers werken aan dezelfde planning, opdrachten veranderen en beschikbare capaciteit moet steeds opnieuw worden berekend.&nbsp;\u003C/p>\n\u003Cp>In dat geval kan gespecialiseerde werkvoorraadsoftware zoals vPlan interessant zijn. Hiermee breng je openstaande werkzaamheden en de beschikbare capaciteit samen in &eacute;&eacute;n overzicht, waardoor je minder tijd kwijt bent aan het handmatig bijwerken van de planning.\u003C/p>",{"question":42,"answer":43},"Welke software is geschikt voor het plannen van werkvoorraad?","\u003Cp>Goede werkvoorraadsoftware helpt je om openstaande opdrachten overzichtelijk te beheren, prioriteiten te bepalen en werkzaamheden in te plannen op basis van beschikbare capaciteit.&nbsp;\u003C/p>\n\u003Cp>Let bij het kiezen van software vooral op functionaliteiten zoals een backlog, capaciteitsplanning, deadlines, verschillende planningsweergaven en inzicht in de voortgang.&nbsp;\u003C/p>\n\u003Cp>Met vPlan kun je bijvoorbeeld openstaande opdrachten verzamelen in een backlog en deze vervolgens inplannen op een overzichtelijk planbord. Dankzij het inzicht in capaciteit en werkbelasting zie je waar medewerkers of machines nog beschikbaar zijn. Zo maak je gemakkelijker een realistische planning en kun je sneller reageren op veranderingen.&nbsp;\u003C/p>",{"question":45,"answer":46},"Hoe plan je openstaande werkbonnen efficiënt?","\u003Cp>Het effici&euml;nt inplannen van werkbonnen begint met een duidelijk overzicht van alle openstaande opdrachten. Leg per werkbon vast wat er moet gebeuren, hoeveel tijd de werkzaamheden naar verwachting kosten en wanneer deze uiterlijk uitgevoerd moeten zijn.&nbsp;\u003C/p>\n\u003Cp>Bepaal vervolgens welke opdrachten prioriteit hebben en controleer welke monteurs beschikbaar zijn. Houd daarbij rekening met hun vaardigheden, werklocatie en eventuele benodigde materialen.&nbsp;\u003C/p>\n\u003Cp>Door werkbonnen te koppelen aan de beschikbare capaciteit, voorkom je dat monteurs te veel werkzaamheden krijgen toegewezen. Zorg daarnaast dat je ruimte houdt voor spoedopdrachten en onverwachte vertragingen. Met een actuele planning kun je sneller bijsturen wanneer er gedurende de dag iets verandert.&nbsp;\u003C/p>",{"question":48,"answer":49},"Wat betekent WIP bij werkvoorraadbeheer?","\u003Cp>WIP staat voor Work in Progress, oftewel onderhanden werk. Dit zijn werkzaamheden die al zijn gestart, maar nog niet volledig zijn afgerond.&nbsp;\u003C/p>\n\u003Cp>Een voorbeeld is een productieorder waaraan momenteel wordt gewerkt of een installatieproject dat nog in uitvoering is. Deze opdrachten maken nog steeds deel uit van de totale werkvoorraad.&nbsp;\u003C/p>\n\u003Cp>Wanneer er te veel werkzaamheden tegelijk worden gestart, kan de hoeveelheid onderhanden werk flink oplopen. Medewerkers moeten vaker schakelen tussen opdrachten en het duurt mogelijk langer voordat werkzaamheden worden afgerond.\u003C/p>\n\u003Cp>Door het aantal gelijktijdige opdrachten te beperken en eerst lopend werk af te ronden, kun je de doorstroming verbeteren en voorkomen dat de werkvoorraad onnodig groeit.\u003C/p>",{"id":4,"blog_id":16,"language_code":51,"title":52,"slug":53,"summary":20,"excerpt":54,"content":55,"extra_info":10,"result_highlights":10,"region":10,"industry":10,"company_type":10,"integrations":10,"key_features":10,"meta_title":56,"meta_description":57,"faqs":58,"partner_image":10,"partner_biography":10,"partner_author":10},"en","Planning outstanding work: how to stay in control of workload and capacity","planning-outstanding-work-how-to-stay-in-control-of-workload-and-capacity","\u003Cp>New jobs keep coming in while your team is busy completing ongoing work. Meanwhile, the list of outstanding tasks continues to grow, making it increasingly difficult to decide what needs to be done and when.&nbsp;\u003C/p>\n\u003Cp>This list of outstanding work is known as the work backlog. It includes all tasks, orders, work orders and cases that still need to be scheduled or completed. In this context, we're talking about work that remains to be done, rather than physical stock stored in a warehouse.&nbsp;\u003C/p>\n\u003Cp>By planning your workload effectively, you know exactly what still needs to be done, which jobs take priority and how much time is available to complete them. This helps you stay organised, avoid unnecessary delays and create a realistic schedule.&nbsp;\u003C/p>\n\u003Cp>In this blog, we'll show you how to gain a clear overview of your outstanding work, set priorities and schedule tasks efficiently.&nbsp;\u003C/p>","\u003Ch2>What is work backlog planning?&nbsp;\u003C/h2>\n\u003Cp data-pm-slice=\"1 1 []\">Work backlog planning involves keeping track of all outstanding work and deciding when it can be carried out. This means considering the priority of each job, the time required and the available capacity of your employees and machines.\u003C/p>\n\u003Cp>The type of work in your backlog will vary depending on your organisation. A manufacturing company, for example, may have outstanding production orders, while an installation company needs to schedule maintenance and repair jobs. For an accountancy firm, it might involve client files that still need to be processed.\u003C/p>\n\u003Cp>In each case, the challenge is the same: making sure the right people carry out the right work at the right time. By managing your outstanding work effectively, you can see which jobs are still waiting, what's already scheduled and how much capacity is available for new work.\u003C/p>\n\u003Cp>Having a large amount of outstanding work isn't necessarily a problem. It becomes challenging when you lose track of what's in your pipeline and can no longer accurately estimate when jobs will be completed.\u003C/p>\n\u003Chr>\n\u003Ch2>Why does your work backlog become too large?&nbsp;\u003C/h2>\n\u003Cp data-pm-slice=\"1 1 []\">A growing work backlog isn't necessarily a problem. In fact, it can be a sign that your business is receiving plenty of new orders. The challenge arises when more work consistently comes in than your team can complete. Jobs remain outstanding for longer, deadlines become harder to meet and scheduling new work becomes increasingly difficult. There are several reasons why this can happen.\u003C/p>\n\u003Ch3 data-pm-slice=\"1 1 []\">Limited visibility of available capacity\u003C/h3>\n\u003Cp>When you don't know exactly how much time your employees or machines have available, it's difficult to determine how much work you can schedule. New jobs are accepted even though the schedule is already full. As a result, outstanding work continues to build up.\u003C/p>\n\u003Ch3>Unclear priorities\u003C/h3>\n\u003Cp>Not every job is equally urgent. Yet employees often start with the tasks that seem easiest or most obvious, while more important work is left waiting. Without clear priorities, it becomes difficult to complete jobs in the right order.\u003C/p>\n\u003Ch3>Starting too many jobs at once\u003C/h3>\n\u003Cp>When employees work on several jobs simultaneously, they constantly have to switch between tasks. This takes time and means jobs remain unfinished for longer. By completing ongoing work before starting new tasks, you can reduce the amount of work in progress.&nbsp;\u003C/p>\n\u003Ch3>Delays and dependencies\u003C/h3>\n\u003Cp>Some jobs cannot begin until other tasks have been completed. For example, a production order may be waiting for materials, or a service engineer may need a replacement part before starting a repair. When these dependencies aren't clear, jobs can be scheduled too early, leading to unnecessary delays.&nbsp;\u003C/p>\n\u003Cp>A large work backlog isn't always caused by a shortage of staff or time. The way work is allocated, scheduled and carried out also plays an important role.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Work backlog, backlog and work in progress: what's the difference?&nbsp;\u003C/h2>\n\u003Cp>When planning work, you'll often come across terms such as work backlog, backlog and work in progress (WIP). These terms are sometimes used interchangeably, but each has a different meaning.&nbsp;\u003C/p>\n\u003Cp>The main difference is the stage a job has reached. Some tasks are still waiting to be rescheduled, other have already been added to the schedule, while some are currently in progress.&nbsp;\u003C/p>\n\u003Cdiv style=\"width: 100%; overflow-x: auto; margin: 24px 0;\">\n\u003Cp>&nbsp;\u003C/p>\n\u003Ctable style=\"width: 114.42%; border-collapse: collapse; font-family: inherit; font-size: 15px; line-height: 1.6; text-align: left;\">\n\u003Cthead>\n\u003Ctr style=\"background-color: #f3f4f6;\">\n\u003Cth style=\"width: 32.1429%; border: 1px solid rgb(156, 163, 175); padding: 14px; text-align: left;\" scope=\"col\">Term\u003C/th>\n\u003Cth style=\"width: 34.6154%; border: 1px solid rgb(156, 163, 175); padding: 14px; text-align: left;\" scope=\"col\">Meaning\u003C/th>\n\u003Cth style=\"width: 33.2418%; border: 1px solid rgb(156, 163, 175); padding: 14px; text-align: left;\" scope=\"col\">\n\u003Cp>Example\u003C/p>\n\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 32.1429%;\">\u003Cstrong>Total outstanding work\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 34.6154%;\">All work that has not yet been completed, including unscheduled, scheduled and ongoing jobs.\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 33.2418%;\">All open production orders within a company.\u003C/td>\n\u003C/tr>\n\u003Ctr style=\"background-color: #f9fafb;\">\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 32.1429%;\">\u003Cstrong>Backlog\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 34.6154%;\">Work that still needs to be scheduled and has not yet been assigned a specific time or resource.\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 33.2418%;\">New orders waiting to be added to the schedule.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 32.1429%;\">\u003Cstrong>Scheduled work\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 34.6154%;\">Jobs that have been assigned a specific time, employee, team or machine.\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 33.2418%;\">A maintenance job scheduled for Tuesday morning.\u003C/td>\n\u003C/tr>\n\u003Ctr style=\"background-color: #f9fafb;\">\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 32.1429%;\">\u003Cstrong>Work in progress (WIP)\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 34.6154%;\">Work that has already started but has not yet been completed.\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; width: 33.2418%;\">A production order currently being processed.\u003C/td>\n\u003C/tr>\n\u003C/tbody>\n\u003C/table>\n\u003Cp>The backlog is part of your total outstanding work. Once you schedule a job from the backlog, it becomes part of your schedule. When employees start working on it, it is considered work in progress (WIP). Only when the job has been completed is it removed from your outstanding work.&nbsp;\u003C/p>\n\u003Cp>Making this distinction helps you identify where work is getting held up. For example, are lots of jobs waiting to be scheduled, or have too many jobs been started but not yet completed? With this insight, you can better identify which areas of your planning need attention.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>How can you get a clear overview of your outstanding work?&nbsp;\u003C/h2>\n\u003Cp data-pm-slice=\"1 1 []\">Effective work backlog planning starts with having a clear overview. You need to know which jobs are still outstanding before you can decide when to carry them out. In practice, however, this isn't always straightforward.\u003C/p>\n\u003Cp>New jobs might arrive by email, ongoing work may be tracked in Excel, and employees often maintain their own task lists. As a result, information becomes scattered, making it difficult to get a complete picture of all the work that still needs to be done.\u003C/p>\n\u003Cp>By bringing all outstanding work together in one central place, you gain a much clearer overview. You can see which jobs still need to be scheduled, what's already in the schedule and which tasks are currently in progress.\u003C/p>\n\u003Ch3>What information do you need?&nbsp;\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">A list of outstanding jobs alone isn't enough. To manage your workload effectively, you also need information about what each job involves, its progress and how much time it will take. The following details will help you build a clear picture:\u003C/p>\n\u003C/div>\n\u003Ctable style=\"width: 100%; border-collapse: collapse; font-family: inherit; font-size: 15px; line-height: 1.6; text-align: left; height: 552px;\">\n\u003Cthead>\n\u003Ctr style=\"background-color: rgb(243, 244, 246); height: 24px;\">\n\u003Cth style=\"width: 35.8491%; border: 1px solid rgb(156, 163, 175); padding: 14px; text-align: left; height: 24px;\" scope=\"col\">Information\u003C/th>\n\u003Cth style=\"width: 64.1509%; border: 1px solid rgb(156, 163, 175); padding: 14px; text-align: left; height: 24px;\" scope=\"col\">Why is it important?\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\n\u003Ctr style=\"height: 72px;\">\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 72px; width: 35.8491%;\">\u003Cstrong>Job or task description\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 72px; width: 64.1509%;\">Makes it clear what needs to be done and what each job involves.\u003C/td>\n\u003C/tr>\n\u003Ctr style=\"background-color: rgb(249, 250, 251); height: 72px;\">\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 72px; width: 35.8491%;\">\u003Cstrong>Priority\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 72px; width: 64.1509%;\">Helps you decide which jobs need to be completed first.\u003C/td>\n\u003C/tr>\n\u003Ctr style=\"height: 96px;\">\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 96px; width: 35.8491%;\">\u003Cstrong>Deadline\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 96px; width: 64.1509%;\">Shows when a job needs to be completed and helps prevent missed deadlines.\u003C/td>\n\u003C/tr>\n\u003Ctr style=\"background-color: rgb(249, 250, 251); height: 96px;\">\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 96px; width: 35.8491%;\">\u003Cstrong>Estimated hours\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 96px; width: 64.1509%;\">Helps you estimate how much capacity is needed to complete the work.\u003C/td>\n\u003C/tr>\n\u003Ctr style=\"height: 96px;\">\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 96px; width: 35.8491%;\">\u003Cstrong>Assigned employee or resource\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 96px; width: 64.1509%;\">Shows who is responsible for the job or which machine or resource is required.\u003C/td>\n\u003C/tr>\n\u003Ctr style=\"background-color: rgb(249, 250, 251); height: 96px;\">\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 96px; width: 35.8491%;\">\u003Cstrong>Current status\u003C/strong>\u003C/td>\n\u003Ctd style=\"border: 1px solid rgb(156, 163, 175); padding: 14px; height: 96px; width: 64.1509%;\">Indicates whether a job is waiting to be scheduled, planned, in progress or completed.\u003C/td>\n\u003C/tr>\n\u003C/tbody>\n\u003C/table>\n\u003Cp>With this information, you can assess your outstanding work much more effectively. For example, you can see which jobs are approaching their deadlines, how many hours of work are still outstanding and which tasks are waiting for a specific employee or machine.&nbsp;\u003C/p>\n\u003Cp>This gives you an up-to-date overview to help you plan ahead. The next step is to decide which jobs should take priority.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>How do you prioritise your outstanding work?&nbsp;\u003C/h2>\n\u003Cp data-pm-slice=\"1 1 []\">Once you have a clear overview of all outstanding work, it's time to decide which jobs should be completed first. Not every job is equally urgent, and some tasks can wait a little longer.\u003C/p>\n\u003Cp>When prioritising your outstanding work, consider factors such as deadlines, urgency, customer commitments and the capacity required. This prevents employees from simply working on jobs in the order they arrive, while more important tasks are left waiting.\u003C/p>\n\u003Ch3>Decide which jobs should take priority\u003C/h3>\n\u003Cp>A straightforward way to prioritise your work backlog is to divide outstanding jobs into three categories:&nbsp;\u003C/p>\n\u003Cul>\n\u003Cli>\u003Cstrong>High priority:&nbsp;\u003C/strong>Urgent jobs, tasks with approaching deadlines or work that is holding up other processes.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Normal priority:&nbsp;\u003C/strong>Regular jobs that need to be completed according to agreed schedules and commitments.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Low priority:&nbsp;\u003C/strong>Less urgent tasks that can be postponed if necessary.&nbsp;\u003C/li>\n\u003C/ul>\n\u003Cp data-pm-slice=\"1 1 []\">You can also use a \u003Ca href=\"https://vplan.com/nl/blog/inspiratie/moscow-methode\">method such as MoSCoW\u003C/a>, which divides work into four categories: Must have, Should have, Could have and Won't have. This is particularly useful when several stakeholders need to agree on which tasks are most important.\u003C/p>\n\u003Cp>Whichever method you choose, make sure everyone understands the priorities. This helps employees know which jobs need their attention first and allows planners to take these priorities into account when scheduling work.\u003C/p>\n\u003Ch3>Take dependencies into account\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">A high-priority job can't always be carried out immediately. Sometimes materials are missing, another task needs to be completed first or a specific employee isn't yet available.\u003C/p>\n\u003Cp>For example, a manufacturing company needs to complete an important order, but the required raw materials won't arrive for another three days. Scheduling that order for today wouldn't make much sense. Instead, the available time could be used for other jobs that are ready to be carried out.\u003C/p>\n\u003Cp>That's why it's important to consider whether jobs are actually ready to be carried out when setting priorities. This helps ensure important work is completed on time without causing unnecessary delays to other jobs.\u003C/p>\n\u003Chr>\n\u003Ch2>How do you match your outstanding work to available capacity?&nbsp;\u003C/h2>\n\u003Cp data-pm-slice=\"1 1 []\">You now have a clear overview of your outstanding jobs and know which tasks take priority. But can you actually fit all that work into your schedule? To find out, you need to know how much time each job requires and how much capacity your team has available.\u003C/p>\n\u003Cp>Start by estimating the hours required for each job. Then compare these with the available hours of your employees, teams or machines. Remember to account for holidays, leave, maintenance and other activities that take up time.\u003C/p>\n\u003Cp>With \u003Cstrong>vPlan\u003C/strong>, you can easily see how much capacity is available. You can check how much work is already scheduled and where employees or teams still have room for additional jobs. This makes it easier to distribute work evenly and avoid overloading one employee while another still has time available.\u003C/p>\n\u003Ch3>A practical example\u003C/h3>\n\u003Cp>Imagine a service team has 120 outstanding work orders, representing a total of 420 hours of work. Over the next two weeks, the team has 300 hours of available capacity.&nbsp;\u003C/p>\n\u003Cp>This means you won't be able to complete all jobs within those two weeks. There will still be 120 hours of work left to schedule at a later date.&nbsp;\u003C/p>\n\u003Cp>To get better understanding of the size of your outstanding workload, you can use the following calculation:&nbsp;\u003C/p>\n\u003Cblockquote>\n\u003Cp>\u003Cstrong>Outstanding work / available hours per planning period = number of planning periods required\u003C/strong>\u003C/p>\n\u003C/blockquote>\n\u003Cp>In this example, 420/300 = 1.4 planning periods. That means there is approximately 2.8 weeks of outstanding work, assuming capacity remains the same and no new jobs are added.&nbsp;\u003C/p>\n\u003Cp>The planner can now decide which work orders should take priority and which will need to remain in the backlog for the time being.&nbsp;\u003C/p>\n\u003Ch3>Look beyond the total number of available hours\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">Having an overview of your total capacity is a good starting point, but it doesn't always tell the whole story. Your team might have enough hours available overall, while the employees with the specific skills needed for certain jobs are already fully booked.\u003C/p>\n\u003Cp>That's why it's important to look at how work is distributed across your team. With vPlan's workload view, you can see how much work is scheduled for each employee or resource. This helps you identify potential bottlenecks and find available capacity for new jobs.\u003C/p>\n\u003Cp>By matching your outstanding work to available capacity, you can make better-informed planning decisions. You'll know how much work your team can realistically complete, which jobs need to wait and when capacity will become available for new work.\u003C/p>\n\u003Chr>\n\u003Ch2>How to plan your outstanding work: 8 practical steps\u003C/h2>\n\u003Cp data-pm-slice=\"1 1 []\">You now know which jobs are outstanding, which ones take priority and how much capacity you have available. It's time to turn that information into a practical schedule. These eight steps will help you schedule work at the right time and stay in control when things change.\u003C/p>\n\u003Ch3 data-pm-slice=\"1 1 []\">Step 1. Gather all outstanding work\u003C/h3>\n\u003Cp>Start by collecting all jobs that still need to be completed. Include tasks that have previously been postponed or are waiting for a suitable time slot. Keeping everything in one place helps ensure that no jobs are overlooked.&nbsp;\u003C/p>\n\u003Ch3>Step 2. Review and update your outstanding work\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">Not every job on your list will necessarily still be relevant. A task might already have been completed, a deadline may have changed or the same job could appear more than once. Review your outstanding work regularly and make sure the information is accurate before you start scheduling.\u003C/p>\n\u003Ch3 data-pm-slice=\"1 1 []\">Step 3. Decide which jobs take priority\u003C/h3>\n\u003Cp>Identify which jobs are most important and need to be completed first. Consider deadlines, customer commitments and any dependencies between tasks. This helps ensure that urgent work doesn't get left behind.&nbsp;\u003C/p>\n\u003Ch3>Step 4. Assess your available capacity\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">Check how much time your employees, teams or machines have available during the period you're planning for. Remember to account for holidays, leave and other commitments. This gives you a realistic picture of how much work you can schedule.\u003C/p>\n\u003Ch3 data-pm-slice=\"1 1 []\">Step 5. Decide how far ahead to plan\u003C/h3>\n\u003Cp>The right planning period varies from one organisation to another. A service team that regularly receives urgent requests, for example, benefits from a schedule that can be adjusted daily. A manufacturing company with longer lead times will often need to plan several weeks ahead. Choose a planning period that suits the way your business operates.&nbsp;\u003C/p>\n\u003Ch3>Step 6. Schedule the work\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">You can now allocate jobs to the available employees or machines. Start with the highest-priority tasks and check that the estimated hours fit within your available capacity. Where necessary, leave some room for unexpected jobs or delays.\u003C/p>\n\u003Ch3 data-pm-slice=\"1 1 []\">Step 7. Monitor progress\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">Creating a schedule is one thing, but you also need to know whether work is progressing as planned. Regularly check which jobs have started, which have been completed and which are experiencing delays. This helps you spot problems early and prevent outstanding work from building up further.\u003C/p>\n\u003Ch3 data-pm-slice=\"1 1 []\">Step 8. Keep your schedule up to date\u003C/h3>\n\u003Cp>New orders, changing priorities or an employee unexpectedly being absent can all affect your schedule. By regularly updating your outstanding work and planning, you maintain an accurate overview and ensure everyone knows what needs to be done.&nbsp;\u003C/p>\n\u003Cp>Following these steps makes planning outstanding work a regular part of your daily operations. You'll have a clearer picture of what still needs to be done and be better prepared to respond when circumstances change.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>How much outstanding work is healthy?&nbsp;\u003C/h2>\n\u003Cp data-pm-slice=\"1 1 []\">There is no fixed amount of outstanding work that is ideal for every business. A healthy workload depends on several factors, including available capacity, job lead times and the volume of new work coming in.\u003C/p>\n\u003Cp>A manufacturing company that plans months ahead, for example, will have different requirements from a service team that deals with new breakdowns and urgent requests every day. Having a large amount of outstanding work isn't necessarily a problem, as long as you know when jobs can be completed and can meet your commitments.\u003C/p>\n\u003Ch3>Signs your work backlog is becoming too large\u003C/h3>\n\u003Cp>There are several warning signs that your outstanding work is no longer in line with your available capacity. These include:&nbsp;\u003C/p>\n\u003Cul>\n\u003Cli>\u003Cstrong>Deadlines are regularly pushed back&nbsp;\u003C/strong>because there isn't enough time to complete all the work.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Employees consistently work overtime&nbsp;\u003C/strong>to keep up with the workload.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Jobs remain outstanding for longer,&nbsp;\u003C/strong>leaving customers waiting\u003C/li>\n\u003Cli>\u003Cstrong>Your backlog keeps growing&nbsp;\u003C/strong>because more work is coming in than your team can complete.\u003C/li>\n\u003C/ul>\n\u003Cp>To spot these issues early, it's worth&nbsp;\u003C/p>\n\u003Cp data-pm-slice=\"1 1 []\">regularly comparing how much new work comes in with how much your team actually completes. If your outstanding workload continues to grow week after week, it's a sign that you need to review your schedule, priorities or available capacity.\u003C/p>\n\u003Cp>A healthy amount of outstanding work is ultimately one that you can manage effectively, schedule realistically and complete within the agreed timescales.\u003C/p>\n\u003Chr>\n\u003Cp>Managing outstanding work in Excel or with software?&nbsp;\u003C/p>\n\u003Cp data-pm-slice=\"1 1 []\">Many businesses start by managing their outstanding work in Excel. And that's perfectly understandable. It's easy to create an overview of outstanding jobs, add deadlines and keep track of completed tasks. For a small team with a manageable amount of outstanding work, this can work perfectly well.\u003C/p>\n\u003Cp>However, as your business grows, keeping that overview up to date often becomes more challenging. More jobs come in, several employees work with the same schedule and priorities change regularly. Updating all this information manually takes increasingly more time and increases the risk of errors.\u003C/p>\n\u003Cp>This is where dedicated \u003Cstrong>work backlog management software\u003C/strong> can help. It brings outstanding jobs, schedules and available capacity together in one place. Changes are immediately visible to everyone involved, reducing the time spent updating schedules and coordinating work.\u003C/p>\n\u003Cdiv style=\"width: 100%; overflow-x: auto; margin: 24px 0;\">\n\u003Ctable style=\"width: 100%; border-collapse: collapse; font-family: inherit; font-size: 15px; line-height: 1.6; text-align: left; border: 1px solid #9ca3af;\">\n\u003Cthead>\n\u003Ctr style=\"background-color: #f3f4f6;\">\n\u003Cth style=\"width: 50%; border: 1px solid #9ca3af; padding: 14px; text-align: left;\" scope=\"col\">Managing outstanding work in Excel\u003C/th>\n\u003Cth style=\"width: 50%; border: 1px solid #9ca3af; padding: 14px; text-align: left;\" scope=\"col\">Managing outstanding work with software\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">Suitable for small, manageable workloads.\u003C/td>\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">Suitable for larger workloads with frequently changing priorities.\u003C/td>\n\u003C/tr>\n\u003Ctr style=\"background-color: #f9fafb;\">\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">Information often needs to be updated manually.\u003C/td>\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">Changes and job statuses can be managed centrally.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">Calculating capacity requires custom formulas.\u003C/td>\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">Capacity and workload can be linked directly to the schedule.\u003C/td>\n\u003C/tr>\n\u003Ctr style=\"background-color: #f9fafb;\">\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">Collaboration requires clear agreements on versions and updates.\u003C/td>\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">Multiple employees can work from the same up-to-date schedule.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">Automations and integrations require additional configuration.\u003C/td>\n\u003Ctd style=\"border: 1px solid #9ca3af; padding: 14px;\">\n\u003Cp>Integrations and automations are often available as built-in features.\u003C/p>\n\u003C/td>\n\u003C/tr>\n\u003C/tbody>\n\u003C/table>\n\u003Ch3>When should you consider work backlog management software?&nbsp;\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">Switching to dedicated software becomes particularly worthwhile when managing your outstanding work starts taking up more and more time. You might have a clear list of outstanding jobs but struggle to see when employees are available. Or perhaps you have to manually adjust the schedule every time an urgent job comes in.\u003C/p>\n\u003Cp>With planning software like \u003Cstrong>vPlan\u003C/strong>, you can link your outstanding work directly to your available capacity. This allows you to see which jobs still need to be scheduled, where there's room for new work and how the workload is distributed across your team.\u003C/p>\n\u003Cp>This makes it easier to plan ahead and respond to changes without constantly having to update multiple spreadsheets or separate schedules.\u003C/p>\n\u003Chr>\n\u003Ch2>What should you look for in good work backlog management software?&nbsp;\u003C/h2>\n\u003Cp data-pm-slice=\"1 1 []\">There are various tools available to help you plan and manage work. However, not every planning tool is equally suited to managing outstanding work. Some focus primarily on tracking tasks, while others offer more advanced features for scheduling work based on available capacity.\u003C/p>\n\u003Cp>The right software for your business depends on how you operate. A manufacturing company, for example, needs visibility of available machine capacity, while an installation company may be more interested in knowing which engineers are available to carry out outstanding work orders.\u003C/p>\n\u003Cp>When comparing work backlog management software, there are several key features to look for:\u003C/p>\n\u003Cul>\n\u003Cli>\u003Cstrong>A clear backlog overview:&nbsp;\u003C/strong>keep all jobs that still need to be scheduled in one central place.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Priorities and deadlines:&nbsp;\u003C/strong>see which jobs need attention first and when they must be completed.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Capacity planning:&nbsp;\u003C/strong>gain insight into the available hours of employees, teams or machines and avoid scheduling more work than your capacity allows.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Different planning views:&nbsp;\u003C/strong>view your work in a timeline, calender, kanban board or list, depending on what works best for your team.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Progress tracking and statuses:&nbsp;\u003C/strong>keep track of which jobs are still waiting, which have been scheduled and which are already in progress.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Automations and integrations:&nbsp;\u003C/strong>reduce manual work by automating repetitive tasks and exchanging data with other systems.&nbsp;\u003C/li>\n\u003Cli>\u003Cstrong>Collaboration and mobile access:&nbsp;\u003C/strong>make sure employees can view schedules and update progress, even when they're on the move or working on site.&nbsp;\u003C/li>\n\u003C/ul>\n\u003Cp>When choosing software, it's worth looking beyond the number of features on offer. What matters most is finding a solution that fits the way your team works every day.&nbsp;\u003C/p>\n\u003Cp>Pay particular attention to how well the software connects your outstanding work with your available capacity. When you can immediately see how much work is still outstanding and how much room you have in your schedule, it becomes much easier to plan new jobs and make adjustments before problems arise.&nbsp;\u003C/p>\n\u003Chr>\n\u003Ch2>Plan your outstanding work with vPlan\u003C/h2>\n\u003Cp data-pm-slice=\"1 1 []\">Want to gain more control over your outstanding work and prevent jobs from being left waiting unnecessarily? With \u003Cstrong>vPlan\u003C/strong>, you can bring all your outstanding tasks, schedules and available capacity together in one clear overview. This means you always know what still needs to be done, which jobs take priority and when your team has time to complete them.\u003C/p>\n\u003Ch3 data-pm-slice=\"1 1 []\">Turn outstanding jobs into a clear schedule\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">With vPlan's backlog, you can easily collect all the work that still needs to be scheduled. Set priorities, add deadlines and other important details, and decide when each job should be carried out.\u003C/p>\n\u003Cp>As capacity becomes available, you can move jobs from your backlog onto your planning board. Choose from different views, including timeline, calendar, Kanban and list, so your team can work in the way that suits them best.\u003C/p>\n\u003Ch3>Plan based on available capacity\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">One of vPlan's biggest advantages is the visibility it provides into capacity and workload. You can see how much work is already scheduled, which employees or machines are available and where there's still room for new jobs.\u003C/p>\n\u003Cp>This makes it easier to distribute work evenly and avoid overloading your team. If an urgent job comes in unexpectedly, you can quickly identify available capacity and adjust your schedule accordingly.\u003C/p>\n\u003Ch3>Keep your outstanding work and progress up to date\u003C/h3>\n\u003Cp data-pm-slice=\"1 1 []\">With vPlan, you can stay in control even after jobs have been scheduled. Employees can update their progress, while you can immediately see which jobs have started, which have been completed and which are experiencing delays.\u003C/p>\n\u003Cp>Automations and integrations with other systems can also help you reduce manual work. This keeps your schedule up to date and ensures everyone is working with the same information.\u003C/p>\n\u003Ch3>Discover how vPlan helps you manage outstanding work\u003C/h3>\n\u003Cp>Whether you're scheduling production orders, service jobs or projects, vPlan gives you a clearer overview of your outstanding work and your team's capacity. You can see what still needs to be done, schedule jobs at the right time and stay in control of progress.&nbsp;\u003C/p>\n\u003Cp>Curious to see what vPlan could do for your business? \u003Ca href=\"https://vplan.com/en/demo\" target=\"_blank\" rel=\"noopener\">Book a personalised demo\u003C/a> and discover how to plan your outstanding work more efficiently. \u003Ca href=\"https://vplan.com/en/create-account\" target=\"_blank\" rel=\"noopener\">Or explore the possibilities and start your free trial\u003C/a>.&nbsp;\u003C/p>\n\u003C/div>","How to plan outstanding work: 8 steps | vPlan","Learn how to manage outstanding work, set priorities and schedule jobs based on available capacity. Discover 8 practical steps to improve your planning",[59,62,65,68,71,74,77,80],{"question":60,"answer":61},"What is outstanding work?","\u003Cp data-pm-slice=\"1 1 []\">Outstanding work refers to all jobs and tasks within an organisation that still need to be scheduled, carried out or completed. This could include production orders, service jobs, work orders, projects or administrative cases.\u003C/p>\n\u003Cp>By keeping track of your outstanding work, you know which jobs still need to be completed and how much time is required to finish them. This helps you set priorities, make better use of available capacity and prevent jobs from being left waiting unnecessarily.\u003C/p>",{"question":63,"answer":64},"What is the difference between outstanding work and a backlog?","\u003Cp>Outstanding work and backlog are often used interchangeably, but they don't mean exactly the same thing. Outstanding work includes all jobs that haven't yet been completed, including those that are already scheduled or currently in progress.\u003C/p>\n\u003Cp>A backog, on the other hand, consists of work that hasn't yet been assigned a specific place in the schedule. For example, new jobs waiting for an available employee or production orders that cannot be scheduled until next month.&nbsp;\u003C/p>\n\u003Cp>The backlog is therefore part of your total outstanding work. Once a job is moved from the backlog into the schedule, it becomes scheduled work. However, it remains part of your outstanding work until it has been fully completed.\u003C/p>",{"question":66,"answer":67},"How do you prioritise outstanding work?","\u003Cp data-pm-slice=\"1 1 []\">You can prioritise outstanding work by assessing jobs based on urgency, deadlines, customer commitments and dependencies. Tasks that are particularly urgent or are holding up other processes should generally take priority.\u003C/p>\n\u003Cp>A practical approach is to divide jobs into three categories: high, normal and low priority. This makes it clear to everyone which tasks need to be completed first.\u003C/p>\n\u003Cp>It's also important to consider whether a job is ready to be carried out. Even if a task is urgent, it may not be possible to start if materials are missing or the right employee isn't available. By reviewing priorities regularly, you can ensure that your schedule reflects the current situation.\u003C/p>",{"question":69,"answer":70},"How do you calculate the amount of outstanding work?","\u003Cp data-pm-slice=\"1 1 []\">To calculate your outstanding workload, add up the estimated hours required to complete all open jobs. You can then compare this total with the available capacity of your employees or machines.\u003C/p>\n\u003Cp>For example, imagine you have 400 hours of outstanding work and your team has 200 hours of capacity available each week. This means you have approximately two weeks' worth of outstanding work, assuming capacity remains the same and no new jobs are added.\u003C/p>\n\u003Cp>Keep in mind that not every employee or machine can carry out every task. That's why it's important to look at how work is distributed across your team. Capacity planning gives you a clearer picture of how much work you can realistically complete and when you'll have room for new jobs.\u003C/p>",{"question":72,"answer":73},"Can you manage outstanding work in Excel?","\u003Cp data-pm-slice=\"1 1 []\">Yes, Excel can be a perfectly suitable tool for managing outstanding work, especially for smaller teams with a manageable number of jobs. You can use a spreadsheet to record tasks, deadlines, priorities and progress.\u003C/p>\n\u003Cp>However, as your business grows, keeping everything up to date often becomes more challenging. Multiple employees may be working from the same schedule, priorities change and available capacity needs to be recalculated regularly.\u003C/p>\n\u003Cp>This is where dedicated work backlog management software, such as \u003Cstrong>vPlan\u003C/strong>, can be useful. It brings outstanding jobs and available capacity together in one overview, reducing the time spent manually updating schedules and spreadsheets.\u003C/p>",{"question":75,"answer":76},"What software is best for planning outstanding work?","\u003Cp data-pm-slice=\"1 1 []\">Good work backlog management software helps you organise outstanding jobs, set priorities and schedule work based on available capacity.\u003C/p>\n\u003Cp>When comparing different tools, look for features such as backlog management, capacity planning, deadlines, different planning views and progress tracking.\u003C/p>\n\u003Cp>With \u003Cstrong>vPlan\u003C/strong>, for example, you can collect outstanding jobs in a backlog and then schedule them on a visual planning board. Thanks to its capacity and workload insights, you can see which employees or machines are available. This makes it easier to create realistic schedules and respond quickly when plans change.\u003C/p>\n\u003Cp>The best solution ultimately depends on your organisation's needs, the type of work you manage and how your team operates.\u003C/p>",{"question":78,"answer":79},"How do you schedule outstanding work orders efficiently?","\u003Cp>Efficient work order scheduling starts with a clear overview of all outstanding jobs. For each work order, record what needs to be done, how long the work is expected to take and when it needs to be completed.&nbsp;\u003C/p>\n\u003Cp>Next, determine which jobs take priority and check which service engineers are available. Consider their skills, location and any materials or equipment required to complete the work.&nbsp;\u003C/p>\n\u003Cp>By matching work orders to available capacity, you can avoid assigning too much work to individual engineers. It's also important to leave some flexibility for urgent requests and unexpected delays. With an up-to-date schedule, you can make adjustments more easily when circumstances change throughout the day.\u003C/p>",{"question":81,"answer":82},"What does WIP mean in work backlog management?","\u003Cp>WIP stands for Work in Progress. It refers to jobs that have already started but haven't yet been completed.&nbsp;\u003C/p>\n\u003Cp>For example, a production order currently being processed or an installation project that's still underway would both be considered work in progress. These jobs remain part of your total outstanding work until they are finished.&nbsp;\u003C/p>\n\u003Cp>When too many jobs are started at the same time, the amount of work in progress can increase significantly. Employees may need to switch between tasks more frequently, and jobs can take longer to complete.&nbsp;\u003C/p>\n\u003Cp>By limiting the number of jobs being worked on simultaneously and focusing on completing ongoing tasks before starting new ones, you can improve workflow and prevent outstanding work from building up unnecessarily.&nbsp;\u003C/p>",{"id":84,"status":5,"photo":85,"first_name":86,"last_name":87,"role":88,"employed":6,"translations":89,"biography":95},22,"/images/cms/aa6afb08-1ea9-4cd4-86ab-66080a1dbb66.jpg","Thijs","Kappert",17,[90,93],{"id":91,"team_id":84,"language_code":17,"biography":92},7,"\u003Cp>Met een scherp oog voor taal en technologie schrijft Thijs over alles wat te maken heeft met software, automatiseringen en productiviteit. Hij ziet het als een kunst om complexe ontwikkelingen begrijpelijk te maken en lezers echt te raken. Dankzij zijn jarenlange ervaring in contentcreatie weet hij precies hoe hij de juiste snaar moet raken bij uiteenlopende doelgroepen.\u003C/p>",{"id":94,"team_id":84,"language_code":51,"biography":95},11,"\u003Cp>With a sharp eye for language and technology, Thijs writes about everything related to software, automation, and productivity. He sees it as an art to make complex developments understandable and to truly engage readers. Thanks to his many years of experience in content creation, he knows exactly how to strike the right chord with diverse audiences.\u003C/p>","",1792637058474]